Installation must be performed by a professional team, with a focus on verifying the wall's load-bearing capacity, floor levelness, and drainage slope. Expansion bolts must be used to secure the stainless steel frame to the wall, spaced no more than 30 cm apart; prior to installing the glass door, the parallelism of the roller tracks must be calibrated, keeping the margin of error within ±1 mm.
Post-installation maintenance includes periodic checks for seal degradation, roller lubrication, and the integrity of frame welds; professional servicing is recommended every six months. In the event of spontaneous glass breakage or frame deformation, the supplier should be contacted to replace parts with components that meet safety standards, thereby avoiding the risks associated with attempting repairs oneself.